Supplied One (1) 550 ton Stainless Steel Cold Water Basin BAC Cooling Tower for Maritime Mall
Design and Installation of chimney for 400 Ton 2 stage York Paraflow Absorption Chiller at Maritime Center Barataria
Supply and Installation of one (1) 300 ton Stainless Steel Cold Water Basin BAC Cooling Tower at TSTT Laventille.
Tatil (Maraval road) - Installation and Commissioning (with Carrier Official) of One (1) 300 ton Carrier Screw chiller.
Supply and Installation of one (1) 120 ton Carrier Air Cooled Chiller (Aqua Snap R-410) at C.L Duprey Building P.O.S.
Carried out Air Flow Audit of All Ducting Systems at National Gas Company
Supply and Installation of sixteen (16) three-way valve controls with thermostats on sixteen (16) chill water Air Handlers at Nicolas Tower Independence Square P.O.S.
Maintenance and repairs; work on York Millennium 300 ton Centrifugal chiller at San Fernando General Hospital San Fernando.
Maintenance and repairs of Fourteen (14) Boarding Bridges Air Conditioning Systems at Piarco International Airport for Airport, Authority of Trinidad and Tobago(AATT)
Maintenance and repairs of the Entire Chilled Water System at the National Academy of Performing Arts (UTT NAPA) inclusive of 2- 300 ton screw chillers; 2- 300 Ton Cooling Tower, Chill Water Air Handlers, Fan Coils etc.
Maintenance and repairs of the entire Air Conditioning System at UTT Valsayn Teachers Training College, inclusive of DX system and mini-split system.
Supply and installation of two (2) 90 TON Chillers at Winsure Building on behalf of the Ministry of the Attorney General and Legal Affairs.
Maintenance and Repairs of HVAC Systems at the Canadian Embassy High Commission, Maple House Building
Maintenance and Repairs of all HVAC Systems at Tatil Building Maraval Road P.O.S.