• Supplied One (1) 550 ton Stainless Steel Cold Water Basin BAC Cooling Tower for Maritime Mall
  • Design and Installation of chimney for 400 Ton 2 stage York Paraflow Absorption Chiller at Maritime Center Barataria
  • Supplied and Installation of One (1) 300 ton Stainless Steel Cold Water Basin BAC Cooling Tower at TSTT Laventille.
  • Tatil (Maraval road) – Installation and Commissioning (with Carrier Official) of One (1) 300 ton Carrier Screw chiller.
  • Supplied and Install One (1) 120 ton Carrier Air Cooled Chiller (Aqua Snap R-410) at C.L Duprey Building P.O.S.
  • Carried out Air Flow Audit of All Ducting Systems at National Gas Company
  • Supply and Installation of Sixteen (16) three-way valve controls with thermostats on sixteen (16) chill water Air Handlers at Nicolas Tower Independence Square P.O.S.
  • Maintenance and repairs; work on York Millennium 300 ton Centrifugal chiller at San Fernando General Hospital San Fernando.
  • Maintenance and repairs of Fourteen (14) Boarding Bridges Air Conditioning Systems at Piarco International Airport for Airport, Authority of Trinidad and Tobago(AATT)
  • Maintenance and repairs of the Entire Chilled Water System at the National Academy of Performing Arts (UTT NAPA) inclusive of 2- 300 ton screw chillers; 2- 300 Ton Cooling Tower, Chill Water Air Handlers, Fan Coils etc.
  • Maintenance and repairs of the entire Air Conditioning System at UTT Valsayn Teachers Training College, inclusive of DX system and mini-split system.
  • Supply and installation of two (2) 90 TON Chillers at Winsure Building on behalf of the Ministry of the Attorney General and Legal Affairs.
  • Maintenance and Repairs of HVAC Systems at the Canadian Embassy High Commission, Maple House Building
  • Maintenance and Repairs of all HVAC Systems at Tatil Building Maraval Road P.O.S.